LEGAL NOTICES
Publisher Information
WEBSITE PUBLISHING COMPANY: Critical Path Ventures
HEAD OFFICE: 23 rue de l'Université 75007 Paris
Email address: contact@critical-path.fr
Publication Director
Mr. Nicolas Foessel, in his capacity as Managing Director.
Website hosting
-
Wix
-
Wix Online Platform Limited
-
Address: 1 Grant's Row, Dublin 2 D02HX96, Ireland.
-
Phone: +1 415-639-9034
Cookies
Article 82 of Law No. 78-17 of January 6, 1978: this site does not use any cookies, neither technical, nor statistical, nor advertising.
Web design
Alexandre Darmon, Art in Research.
Website: www.airnd.fr
Links to other sites
The Site may contain hyperlinks to other sites existing or managed by third parties. The portal cannot exercise any permanent control over these sites, nor assume any responsibility for their conditions of access, their contents, the advertisements and services offered or the use that may be made of them.
Intellectual property
The elements of this site are protected by French copyright legislation.
The elements thus protected (brands, logos, acronyms, images, video sequences, etc.) are the property of Critical Path Ventures.
As such, any reproduction, representation, use, adaptation, modification, incorporation, translation, marketing, partial or complete, in any manner, in any form, by any process and on any medium whatsoever (paper, digital, etc.) is prohibited without the prior written authorization of Critical Path Ventures, except for the exceptions legally permitted by the intellectual property code, under penalty of counterfeiting which may result in imprisonment and a substantial fine.
All reproduction rights are reserved, including for downloadable documents and iconographic and photographic representations.